REQUIREMENTS:
  • At Norway′s second largest airport, negative effects on the environment need to be avoided, which is why they decided to be on the safe side
  • Construction of several separation plants for the open areas, partly in existing basins
  • Short time schedule for project implementation
  • Permanent availability of the separation system for continuous operation
  • Low maintenance costs
  • Reliability
  • Maintenance-free separator system

SOLUTION:
3 CONSTRUCTION PHASES FOR DIFFERENT PROJECTS HAVE BEEN IMPLEMENTED BY INOWA SINCE 2012:
  • HELIPAD:
    High-performance SYSTEM H NS 40 l/s separator
  • APRON WITH DE-ICING AREA:
    High-performance SYSTEM H NS 200 l/s separator - adapted to an existing concrete basin
  • APRONS AT THE NEW TERMINAL:
    2 high performance separators SYSTEM H-C2 NS 90 l/s