Westbahn maintenance hall, Linz/Austria
Municipal sector
REQUIREMENTS:
- Limited space available
- Free-standing implementation required
- Biological pre-cleaning specified
- Availability must be guaranteed 365 days a year
SOLUTION:
- Due to the custom design of this system, it could be planned and implemented over several floors
- A special solution was developed with free-standing sludge trap with oil separation and integrated pump reservoir
- Development of a special solution with free-standing biological pre-treatment
- Features the WATERTEC®WT 6system

